Movincool Office Pro 12 / Office Pro 18 / Office Pro 24 Manuale di Servizio Pagina 61

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 60
Repair Section
61
(3) Checking vacuum
1) Leave the high pressure valve and the low
pressure valve of the gauge manifold closed for
five min or more, and confirm that the gauge
pointer does not return to zero.
2) If the gauge pointer returns gradually to zero
there is a leak somewhere in the system (this
could also include gauge manifold). Perform leak
check according to procedure indicated in the
next step. Once leak has been found and
repaired evacuate the system once more, and
confirm system holds vacuum.
I002184
Return
Pipe Brazing
Leave valves closed for 5
min or more. Pointer of
pressure gauge returning to
zero indicates there is a leak.
LO
Closed
HI
Closed
Valve Setting
Pressure Gauge
Vedere la pagina 60
1 2 ... 56 57 58 59 60 61 62 63 64 65 66 67 68 69

Commenti su questo manuale

Nessun commento